79ce833dd7
executus CI / test (pull_request) Successful in 49s
All low-severity follow-ups on the critic-deadline change:
- hardCap uses max(CriticAbsoluteMax, maxRuntime) instead of a nested if (723193a7).
- Drop the now-dead 90s soft-trigger fallback + its bare literal: the sole caller
passes the resolved MaxRuntime (>0), and Run's unsupervised-run failsafe bounds
even an impossible 0 (8d377051, 2f86bf58).
- Decouple the kernel doc from a named downstream convar ("a 6h host convar")
(730c67fc).
Graded false-positive: agent.go BackstopMultiplier validation (handled in the host;
not in this diff), the 24h default "magic number" (matches every withFallbacks
default), and the defer-in-conditional pattern (idiomatic). Kept: the thorough
two-tier comment (this logic regressed once) and the rare-path nested timer.
Co-Authored-By: Claude Opus 4.8 (1M context) <noreply@anthropic.com>
Claude-Session: https://claude.ai/code/session_01Jo75sqmeVPgFUWZQBn179X